Rcdeq Suspension Forced Oil-Cooling Magnetic Separator for Conveyor Belts

Model NO.
RCDEQ
Energy Saving
Energy Saving
Warranty
1 Year
Color
Customized
Customized
Customized
Condition
New
Cleaning Way
Manual Cleaning
Adaptive Belt Speed
Max 4.5 M/S
Dimension
Customized
Capacity
0.5~200tph
Advantage
Engineers Available Overseas
Cooling Way
Oil-Cooling
Transport Package
Polywood and Steel Frame
Specification
stainless steel
Trademark
BAITE
Origin
China
HS Code
84741000
Production Capacity
200PCS Per Year
Reference Price
$ 810.00 - 17,100.00

Product Description

Introduction:
RCDEQ(RCDFQ) series forced oil cooling overband magnetic separator for conveyor belts is mainly used in occasions with particularly high iron removal requirements in coal conveying ports, large scale thermal power plants, coal mines, etc. It is suspended above large conveyor belt to effectively eliminate detonator, lead wire and other small iron pieces in the coal, and can work in dusty, humid, seriously salt spray corrosive and other harsh environments. There are seven kinds of specifications for magnetic filed intensity at rated suspension height: 90 mT, 120 mT, 150 mT, 175 mT, 200mT, 225 mT and 250 mT.
Feature:
    1. Magnetic route is short, magnetic waste less, the gradient is high and removing iron efficiently.
   2.Light weight, compact cooling structure and high heat-releasing efficiently.
3. Absorbing the advanced oil forced circulation technology for the large or medium transformer both home and abroad, it features with low temperature rising (≤40ºC) and the technology is reliable and safety.
4. The exciting coil is completely dipped into the transformer oil to be dustproof, moisture-proof and anti-corrosion.
5. Made three-dimensional excitation coil winding, the area for heat releasing is large to control the temperature rise (≤40ºC) for long service life.
6. Easy maintenance, the drum shape structure, special designed wholly sealed structure to help the equipment run in harsh environments.

 
Overall Dimension Drawing:

Technical Parameters
N O. Mode conveyor belt 
width 
 (mm)
Suspension 
height
(h=mm)
Magnetic 
intensity
(≥mt)
Belt 
speed
(m/s)
Existing 
power 
(≤kw)
Condenser 
power
  (≤kw)
Weight
(kg)
Appearance size 
(mm)
1 RCDEQ-10 T1 1000 300 90 ≤5.8 6.5 0.25 3450 2960×1620×1480
T2 120 9.5 0.25 3820 2960×1620×1520
T3 150 15.0 0.25 4500 3000×1620×1550
2 RCDEQ-12 T1 1200 350 90 9.0 0.25 3850 3250×1770×1520
T2 120 14.0 0.25 4620 3350×1770×1590
T3 150 20.0 0.25 6600 3520×1770×1590
3 RCDEQ-14 T1 1400 400 90 14.0 0.25 4650 3350×1750×1550
T2 120 20.0 0.25 6780 3520×1860×1590
T3 150 29.0 0.25 8560 3630×1860×1620
4 RCDEQ-16 T1 1600 450 90 18.0 0.25 5760 3520×1850×1590
T2 120 28.0 0.25 8920 3750×2250×1620
T3 150 32.0 0.25 10200 3950×2250×1630
T4 175 52.0 0.75 12300 4120×2470×1750
T5 200 70.0 0.75 14375 4170×24700×1750
T6 225 85.0 1.1 16730 4230×24900×1800
T7 250 104.0 0.55×2 18250 4350×25300×1860
5 RCDEQ-18 T1 1800 500 90 26.0 0.75 8800 3950×2250×1630
T2 120 32.0 0.75 10500 3950×2450×1650
T3 150 40.0 0.75 12500 4000×2450×1670
T4 175 56.0 0.75 18560 4240×2500×1800
T5 200 75.0 0.75 20754 4300×2520×1850
T6 225 90.0 1.1 22500 4300×2580×1900
T7 250 107.0 0.55×2 23500 4400×2650×1950
6 RCDEQ-20 T1 2000 550 90 30.0 0.75 11650 3950×2450×1650
T2 120 39.0 0.75 13500 4100×2680×1670
T3 150 41.0 0.75 15200 4620×2680×1670
T4 175 70.0 0.55×2 24580 4400×2680×1830
T5 200 83.0 0.55×2 25435 4470×2700×1900
T6 225 104.0 0.55×2 27890 4520×2730×2150
T7 250 125.0 0.55×2 29500 4600×2800×2250
7 RCDEQ-22 T1 2200 600 90 39 0.75 13200 4100×2680×1670
T2 120 42 0.75 16500 4260×2750×1690
T3 150 45 0.75 17260 4500×2750×1690
T4 175 100 0.55×2 28750 4650×2850×2200
T5 200 121 0.55×2 30445 4700×2900×2300
T6 225 153 0.55×2 32270 4780×2900×2300
T7 250 176 0.55×2 34100 4830×2950×2370
8 RCDEQ-24 T1 2400 650 90 40 0.75 16800 4260×2750×1690
T2 120 46 0.75 18500 4500×2750×1690
T3 150 54 0.75 22000 4800×2950×1720
T4 175 120 0.55×2 34750 4600×2850×2100
T5 200 150 0.55×2 37680 4700×2950×2280
T6 225 180 0.55×2 40585 4850×3000×2430
T7 250 200 1.1×2 44500 4950×3100×2560 NO


FAQ
Q: Are you a factory ? 
A: Yes,we are factory, which was established in 2006.
We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & warehouse equipment.
Q:   Terms of Payment:
A: 30% of the total amount by TT as deposit, the balance to be paid by TT or L/C at sight before the machines leaving seller' factory.
100% irrevocable L/C at sight.
 Q:Time for preparation of goods:
A: The above machines shall be ready for delivery during 45 days   from the date of receiving the deposit/LC, excl uding the time of waiting for shipment. If there is any delay of delivery caused by seller, 3‰ of the total amount shall be paid to buyer each day, but this amount shall not exceed the amount of deposit; if the delay is caused by buyer, 3‰ of the total amount shall be paid to seller each day, but this amount shall not exceed 10% of total value of machines.       
 Q:Guarantee period:
   A: The guarantee period for the above machines is twelve months from the date of putting into use, but not exceeds twenty-four months after the machines leaving seller's factory. It is not applicable for quick wear parts.
Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. Every step will be send to you in time.
Q: Can I customize shelving or racking at my own size?
  A: Sure.
Q: If i need the complete mineral processing line. is Baite  able to help us build it?

A:  Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service. 

Why Choose us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.

3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement.    
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4. 2  If  there is any equipment f ailure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4. 3  Beyond the guarantee period, the seller can provide services and fittings at a most preferential price.  
4. 4 The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.