Factory Supply Boron Oxide B2o3 CAS 1303 -86-2 Fine Chemical with Best Price

Model NO.
DL-OG256
Colour
White
Lead Time
15-25 Days
Sample
Available
Transport Package
25kg/Bag
Trademark
DuLing
Origin
China
Production Capacity
50mt/Month
Reference Price
$ 45.00 - 90.00

Product Description

Product Description

 

Specification:
Product Name
 Boron oxide
CAS No.
MF
 B2O3
MW
 69.62
  Melting Point    450 °C(lit.)
  Boiling Point    1860 °C
  Density    2.46 g/mL at 25 °C(lit.)
  Assay    99%
Appearance
 White Powder 
Factory Supply Boron Oxide B2o3 CAS 1303-86-2 Fine Chemical with Best Price

Packaging & Shipping

The product is packed in plastic barrel or zinc galvanized steel barrel with net weight of 25±0.5kg, 200±1kg or as required
by the customer. Store it in cool, dry and ventilated place.

Factory Supply Boron Oxide B2o3 CAS 1303-86-2 Fine Chemical with Best Price Factory Supply Boron Oxide B2o3 CAS 1303-86-2 Fine Chemical with Best Price Factory Supply Boron Oxide B2o3 CAS 1303-86-2 Fine Chemical with Best Price Factory Supply Boron Oxide B2o3 CAS 1303-86-2 Fine Chemical with Best Price

Company Profile

Factory Supply Boron Oxide B2o3 CAS 1303-86-2 Fine Chemical with Best Price

Certifications

Factory Supply Boron Oxide B2o3 CAS 1303-86-2 Fine Chemical with Best Price

 

Our Market

FAQ

 

Q1: What's your advantage?
A: Honest business with competi.tive price and professional serviceon export process.
Q2: Which kind of payment terms doyou accept?
A: Payment by T/T, Western Unionor Bitcoin.
Q3:Which transportation do we use?
A: Samples could be DHL, UPS,TNTEMS, Fedex, and so on;For massorders, It will be delivered by air orsea.
Q4: How about your delivery time?
A: Generally, It will take 3-5 daysafter receiving your advance payment.
Q5: How can we trust you?

Q6: How is your quality control?
Our quality control steps include:
(1) Confirm everything with ourclient before moving to sourcingand production:
(2) check all the materials to ensurethey are correct;
(3) Employ experienced workersand give them proper training;
(4)Inspection throughout the wholeproduction process;
(5) Final inspection before loading.

Leave Your Message

 

✉ Contact Supplier