Description | VKBA6858 Auto Spare Part Car Accessories Rear Axle Wheel Hub Bearing Kit Assembly Unit 4220 1 -S10-A01 for Honda |
OE Number | 42201S10A01 / VKBA6858 |
Size |
Inner Diameter: 43 mm
Flange Diameter: 148 mm Outer Diameter: 81 mm Width : 66 mm Rim: 7-hole Without RPM Sensor |
Position | Rear Axle Left |
Brand | SI, PPB |
Weight | 2.04 Kgs |
Place of Origin | Zhejiang, China |
Certification | ISO9001, TS16949 |
Warranty | 12 months or 30,000 Kms |
Application | HONDA CR-V I |
HONDA : 42201S10A01
HONDA : 42201S10A010M1 HONDA : 42201-S10-A01 |
OSCA : 39008
|
SKFF : VKBA6858
FAGG : 713 6178 20 SNR : R174.75 A.B.S. : 200726 ASHIKA : 44-24040L ASVA : HNWH-RD1RLH AUTEX : 802787 AUTOKIT : 01.97242 Automotive Bearings : ABK428 AUTOTEAM : RA1782 AUTOTEAM : RA1783 BENDIX : 051094B BORG & BECK : BWK872 BREDA LORETT : KRT7774 CALIBER : RC1782 CAUTEX : 760277 FEBEST : 0382-RD1RLH FENOX : WH10103 FENOX : WHB71150 FIRST LINE : FBK872 |
FREMAX : FWB-1349
GENERAL RICAMBI : WH0847 GSP : 9243003 GSP : 9243003K HERTH+BUSS JAKOPARTS : J4714030 IPD : 30-1782 JAPANPARTS : KK-24040L JAPKO : 424040L KAVO PARTS : WBH-2033 KAWE : 8530 40222 KAWE : 8530 40225 KM International : RK1782 KM International : RK1783 KRAFT AUTOMOTIVE : 4106772 LYNXauto : WB-1009 MAGNETI MARELLI : 361111184013 MAGNETI MARELLI : 600000140520 MAXGEAR : 33-0830 Metalcaucho : 90379 |
METALCAUCHO : T490379
METZGER : WM 6858 MEYLE : 31-14 751 0012 MOOG : HO-WB-11776 MOTAQUIP : VBK1103 NIPPARTS : J4714030 NIPPARTS : N4714052 NK : 762629 NPS : H471A28 OPTIMAL : 912664 PATRON : PBK6858H PEMEBLA : JAPKK-24040L QUINTON HAZELL : QWB1158 RUVILLE : 7449 SPIDAN : 27860 STELLOX : 43-28355-SX TIMKEN : 512166 TRISCAN : 8530 40222 TRISCAN : 8530 40225 |
Vehicle Models | Active Years | Engine | Displacement | Power | Type |
HONDA CR-V I (RD) 2.0 (RD1) | 1999-2002 | B20Z1 | 1973 | 98 | SUV |
HONDA CR-V I (RD) 2.0 16V 4WD (RD1, RD3) | 1995-2001 | B20B | 1973 | 94 | SUV |
HONDA CR-V I (RD) 2.0 ELX 16V 4WD (RD1, RD3) | 1999-2002 | B20Z1 | 1973 | 108 | SUV |
Packaging Details |
1 piece in a single box
2 boxes in a carton 30 cartons in a pallet |
Nearest Port | Shanghai or Ningbo |
Lead Time |
For stock parts: 1-5 days.
If no stock parts: < 20 pcs: 15-30 days ≥ 20 pcs: to be negotiated. |