Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod

Model NO.
HAYNES HR235 alloy rod
Surface Treatment
Bright
Commodity Name
Haynes Hr235 Alloy Rod
Alloy or Not
Alloy
Material
Haynes Hr235
Length
6m
Transport Package
Export Standard Packing
Specification
5-200mm
Trademark
Zayi
Origin
China
HS Code
7228309000
Production Capacity
5000tons/Month
Reference Price
$ 98.01 - 108.90

Product Description

Product name HAYNES HR235 high temperature alloy forged alloy steel rod
Shape Round,Forging,Ring,Coil,Flange,Disc,Foil,Spherical,Ribbon,Square,Bar,Pipe,Sheet
Grade Duplex: 2205(UNS S31803/S32205),2507(UNS S32750),UNS S32760(Zeron 100),2304,904L
Others: 253Ma,254SMo,654SMo,F50(UNS S32100)F60,F61,F65,1J22,N4,N6 etc
Alloy : Alloy 20/28/31;
Hastelloy: Hastelloy B/ -2/B-3/C22/C-4/S/ C276/C-2000/G-35/G-30/X/N/g;

Hastelloy B / UNS N10001,Hastelloy B-2 / UNS N10665 / 

DIN W. Nr. 2.4617,Hastelloy C,Hastelloy C-4 / UNS N06455 / DIN W. Nr. 2.4610,Hastelloy C-22 / UNS N06022 / DIN W. Nr. 2.4602,Hastelloy C-276 / 

UNS N10276 / DIN W. Nr. 2.4819,Hastelloy X / UNS N06002 / DIN W. Nr. 2.4665

Haynes: Haynes 230/556/188;
Inconel Series:
Inconel 600/601/602CA/617/625/713/718/738/X-750,Carpenter 20;
Inconel 718 / UNS N07718 / DIN W. Nr. 2.4668,Inconel 601 / UNS N06601 / DIN W. Nr. 2.4851,
Inconel 625 / UNS N06625 / DIN W. Nr. 2.4856,Inconel 725 / UNS N07725,Inconel X-750 / UNS N07750 / DIN W. Nr. 2.4669,Inconel 600 / UNS N06600 / DIN W. Nr. 2.4816
Incoloy: Incoloy 800/800H/800HT/825/925/926;
GH: GH2132,GH3030,GH3039,GH3128,GH4180,GH3044
Monel: Monel 400/K500/R405
Nitronic: Nitronic 40/50/60;
Nimonic: Nimonic 75/80A/90/A263 ;
Specification Wire: 0.01-10mm
Strip: 0.05*5.0-5.0*250mm 
Bar: φ4-50mm;Length 2000-5000mm
Pipe: φ6-273mm;δ1-30mm;Length 1000-8000mm
Sheet: δ 0.8-36mm;Width 650-2000mm;Length 800-4500mm
Product 
Characteristics
1.According to the preparation process can be divided into deformation superalloys, 
casting superalloys and powder metallurgy superalloys.
2.According to the strengthening mode, there are solid solution strengthening type, precipitation 
strengthening type, oxide dispersion strengthening type and fiber strengthening type, etc..
Standard GB,AISI,ASTM,DIN,EN,SUS,UNS etc
Inspection ISO,SGS,BV and so on.
Application High temperature components such as turbine blades, guide vanes, turbine disks, high pressure 
compressor disks,machine manufacturing
and combustion chambers used in the manufacture of aviation, naval and industrial gas turbines
Packaging 1. cases packed in wooden cases
2. paper packaging
3. plastic packing
4. foam packaging
Packaging according to customer requirements or products
Delivery 7-25days or according to the product
Payment L/C,D/A,D/P,T/T,Western Union,MoneyGram,According to customer requirements payments
for offline orders.
Corner of warehouse:
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Production Method:
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Some Detail:
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod Inspection:
Haynes Hr235 High Temperature Alloy Forged Alloy Steel Rod
Packing and transport:


FAQ:

Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.