Product Name | DN65 stainless steel pipe 310S Bevel ends |
Technique | Cold Drawn/Cold Rolling |
Material |
TP304,TP304L,TP304H,TP316,TP316L,TP316Ti,TP309,TP310S,TP314, TP317L,TP321,TP347H,904L. |
Out Diametet | 1/8"~32" |
Wall Thickness | SCH10S,SCH40S,SCH80S,SCH160S |
Lenght | 6m,12m |
Tolerance | +/-0.02mm(OD),+/-0.02mm(WT),+0.5mm/-0(L) |
Finish | Polishing; Annealing; Bright annealing ; Acid pickling |
Standard |
ASTM A312, ASTM A213, ASTM A269, ASTM A511, ASTM A789, ASTM A790,ASTM B161,ASTM B165,ASTM B622,ASTM B444,ASTM B829
|
Loading Port | TIANJIN XINGANG, SHANGHAI,QINGDAO,DALIAN,BAYUQUAN,etc |
Trade Terms | FOB,CIF,CNF,EXW,etc |
Payment Terms |
1) 30% deposit, the balance against copy of B/L by T/T.
2) 30% deposit by T/T, the balance by L/C at sight. 3) 100% irrevocable L/C at sight |
Delivery Time | 7~15 days |
MOQ | 500kgs |
HS Code | 73044190 73044110 |
Trade terms |
FOB,CIF,CFR,EXW |
Payment terms |
1.L/C at sight
2.T/T 30% deposit, the balance against copy of B/L by T/T 3.T/T 30% deposit, the balance before loading by T/T. 4.T/T 30% deposit, the balance by L/C at sight. |
MOQ |
1x20ft container |
FOB price |
USD1000-5500/Ton FOB Tianjin |
Sample time |
5 days |
Lead time |
15-35 days |
Shipment |
by sea |
Supply capability |
5000 Tons |
Sample availability |
Yes |
Packing Information |
water proof paper + GI sheet + iron straps + iron corner protection |
Diameter | SCH 5S | SCH 10S | SCH 20S | SCH 40S | |||||
inch | ASTM | thinkness | weight | thinkness | weight | thinkness | weight | thinkness | weight |
1/4 | 10.3 | 1 | 0.234 | 1.2 | 0.275 | 1.5 | 0.333 | 1.7 | 0.369 |
1/4 | 13.7 | 1.2 | 0.373 | 1.65 | 0.494 | 2 | 0.582 | 2.2 | 0.629 |
3/8 | 17.2 | 1.2 | 0.476 | 1.65 | 0.637 | 2 | 0.755 | 2.3 | 0.854 |
1/2 | 21.3 | 1.65 | 0.816 | 2.1 | 1.02 | 2.5 | 1.18 | 2.8 | 1.31 |
3/4 | 26.7 | 1.65 | 1.04 | 2.1 | 1.3 | 2.5 | 1.52 | 2.9 | 1.74 |
1 | 33.4 | 1.65 | 1.32 | 2.8 | 2.15 | 3 | 2.29 | 3.4 | 2.57 |
1 1/4 | 42.2 | 1.65 | 1.67 | 2.8 | 2.76 | 3 | 2.94 | 3.6 | 3.47 |
1 1/2 | 48.3 | 1.65 | 1.91 | 2.8 | 3.16 | 3 | 3.37 | 3.7 | 4.1 |
2 | 60.3 | 1.65 | 2.39 | 2.8 | 3.98 | 3.5 | 4.92 | 3.9 | 5.44 |
2 1/2 | 73 | 2.1 | 3.84 | 3 | 5.42 | 3.5 | 6.28 | 5.2 | 9.12 |
3 | 88.9 | 2.1 | 4.51 | 3 | 6.37 | 4 | 8.39 | 5.5 | 11.3 |
3 1/2 | 101.6 | 2.1 | 5.15 | 3 | 7.29 | 4 | 9.63 | 5.7 | 13.5 |
4 | 114.3 | 2.1 | 5.81 | 3 | 8.23 | 4 | 10.9 | 6 | 16 |
5 | 141.3 | 2.8 | 9.46 | 3.4 | 11.4 | 5 | 16.6 | 6.6 | 21.7 |
6 | 168.3 | 2.8 | 11.2 | 3.4 | 13.6 | 5 | 19.8 | 7.1 | 27.7 |
8 | 219.1 | 2.8 | 14.7 | 4 | 20.9 | 6.5 | 33.6 | 8.2 | 42.1 |
Since our establishment, we have always adhered to the business policy of "Quality for Survival,
Product for Development, Credibility for Cooperation and Service for Customer". Under the
guidance of this business policy, our company acts as a perennial distributor of seamless steel
pipes, stainless steel pipes and alloy pipes
for
Tianjin Seamless Steel Tube Plant, Chengdu
Pangang Group, Baotou Steel Pipe Plant, Daye Steel Plant, Baoshan Steel Pipe Plant
and other major steel plants. Stainless steel plate and coils for TISCO BAOSTEEL JISCO
ZPSS LISCO, etc
.
Modern large-scale outdoor storage and indoor storage have been
set up in our company, and 20,000 tons of available goods have been prepared.
"Providing Quality Products, Excellent Service, Competitive Prices and Prompt Delivery"
we are looking forward to even greater cooperation with overseas customers based on mutual benefits.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in
stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,
balance before shippment.