The precision laser cutting machine can realize the laser fine processing of metal and most non-metallic sheets, and is suitable for occasions with high requirements on cutting precision and small size of cutting products. It can meet the precision machining of cutting, drilling, scribing and so on at the same time. The application market is gold and silver materials for the jewelry industry, aluminum substrates and copper substrates for the circuit industry, PCD synthetic diamonds for the tool industry, and high-hardness steel for saw blades.
Features
The integrated design of the marble platform frame is adopted, which is stable and firm.
The linear motor platform is matched with a strong focusing cutting head to ensure high-speed and high-precision cutting.
Select fiber lasers with high beam quality to ensure the effect from the
ori
gin
.
It can be matched with QCW lasers to achieve high-peak pulsed laser precision machining of non-metallic products.
M odel | DPX-X2030 | DPX-X4050 | DPX-X6050 | DPX-X6580 |
Cutting range | 200 × 300mm | 400 × 500mm | 600 × 500mm | 650 × 800mm |
Laser source | Continuous fiber laser (power 500-2000W ), QCW fiber laser | |||
Application field | Gold and silver jewelry | Glasses, hardware | Watches, PCD , brittle materials | Aluminum substrate, copper substrate |
drive mode | Linear motor (single / dual drive optional) | |||
Cut repeatability | ≤± 0.01mm/m | |||
running speed | ≥ 50m/min | |||
Recommended cutting thickness | 0.5-10mm |
1. 7*24 hour
2. Response time<12 hours
3.Online support
4.Product replacement
5. Customer field service
6. Backup products during repairing for long time cooperators
* International warranty ONLY valid if products are purchased directly from Horizon Laser or authorized local distributors/agents.
Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.
2. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
3. Do you guarantee safe and secure delivery of products?
Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge.