Machine | Model | Capacity | Feeding size |
Gold washing trommel | JXSC-900 | 40 ton per hour | 150-200mm |
Gold centrifugal concentration | STLB60 | 8-12 ton per hour | 3mm |
Sluice box | 1*6 m | 20 ton per hour | 3-15mm |
Shaking table | LY2100 | 500 kg per hour | 2mm |
Clay Processing System
1. Customized capacity and strong power scrubbing, large capacity can reach 200-250tons per hour.
2. Long washing drum of the scrubber retains material for longer, more vigorous washing for complete separation.
3. One high output electrical motor driving a rubber wheel system providing efficient torque.
4. Rotation speed can be adjusted by advanced reducer.
5. The water with highpressure flushed the inwall of drum.
6. Can accept material up to 230mm.
Gold Shaker Table
Model: 6S
Power: 2.2Kw
Function: to further process the concentrates from the sluice and/or concentrators
3.Related Products
We have professional engineers team to draw flowchart based on customer's gold mine site details.
We supplied full set gold plant: vibrating feeder, trommel scrubber washing machine, gold centrifugal concentrator, sluice box and shaking table.
Below are some on-site photos from our customeres in different countries.