Wear Resistant Epoxy Putty with Ceramic Beads

Model NO.
11470
Material
Epoxy
Classification
Room Curing
Main Agent Composition
Epoxy Resin
Characteristic
Waterproof
Promoter Composition
Curing Agent
Composition
Organic Material
Color
Grey
Package Available
500g, 5kg, 10kg
Transport Package
5kg/Drum
Specification
5kg/set
Trademark
Customized
Origin
China
HS Code
3214109000
Production Capacity
30000tons/Month
Reference Price
$ 13.50 - 14.40

Product Description

TS11470 anti-abrasive epoxy coating with ceramic beads and silicon carbide

Wear Resistant Epoxy Putty with Ceramic Beads Wear Resistant Epoxy Putty with Ceramic Beads


Product Features:

TS11470 is Double components. Reinforce epoxy filled with ceramic beads and silicon carbide. For rebuilding  and protecting equipment worn by big articles, such as pipe, pump housing, impeller and so on.
Wear Resistant Epoxy Putty with Ceramic Beads


Technical Data:
 

Color:

Grey                

Specific gravity:

2.43g/cm³

Mix ratio by weight:

8:1

Mix ratio by volume:

4:1

Working time(min):

65min

Compressive strength(GB/T1041): 115.0MPa
Tensile strength(GB/T6329): 30.0MPa
Shear strength(GB/T7124): 6.0MPa
Flexural strength(GB/T9341): 73.0MPa

Fully cured time:

24h

Temperature range:

-60~160ºC



How to use:
1, surface treatment: Roughing Treatment: Grinding or sandblasting the parts to be treated by angle grinder; Then clean the parts surface, the surface should be clean and dry without oil or dust.
2,mixing: The TS218 epoxy coating mix ratio is A:B=4:1 by weight. Mix two component well and use up the coating within 20 minutes. Don't mix the coating over 1.5kg one time in summer, because mix too much epoxy coating will make curing time faster, thus users will not use up the coating in time. In winter, users can mix over 1.5kg coating depend on the temperature. If temperature is low, user can heat the A-part epoxy resin to make viscosity lower so to speed up the curing time.
3, coating: The suitable thickness of TS218 is 4-8mm. Mixed coating should be coated layer by layer on the parts to be repaired. The first layer should be compacted so that it can be fully infiltrated with the base material.After finish the coating, the part surface shall be smoothed out.
4, curing: Curing time is 12 hours at 25ºC. Mixed coating can be used after 12 hours. If temperature is low, users can use heat treatment to speed up the curing time. In winter, we suggest to use iodine tungsten lamp to heat the coating. Lamp and coating spacing is 40cm.


Packing: 500g/set, 5kg/set, 10kg/set and 20kg/set

Transport and storage: Keep the epoxy coating in dry, cool and covered facility, shelf life is 1 year. Avoid inversion and collision in transportation. This product is not dangerous goods.