odel
|
Project
|
Unit
|
Numerical value
|
Quality of operation
|
kg
|
25500
|
|
Standard bucket capacity
|
m³
|
1.4
|
|
Performance
|
Swing speed
|
r/min
|
11.5
|
Travel speed(High\Low)
|
km/h
|
5.8/3.4
|
|
Maximum traction
|
kN
|
230
|
|
Bucket digging force( ISO)
|
kN
|
185
|
|
Arm digging force( ISO)
|
kN
|
129
|
|
Engine
|
Engine manufacturer
|
-
|
Cumins
|
Power
|
kW/rpm
|
150/2000
|
|
Displacement
|
L
|
6.7
|
|
Emission standards
|
-
|
Guo Si
|
|
Size
|
Total length
|
mm
|
10165
|
Overall width
|
mm
|
3190
|
|
Total height
|
mm
|
3335
|
|
Rear radius of gyration
|
mm
|
3105
|
|
Belt gauge
|
mm
|
2590
|
|
Xiadai wheelbase
|
mm
|
3660
|
|
Scope of work
|
Maximum Digging Distance
|
mm
|
10225
|
Maximum excavation distance on the ground
|
mm
|
10040
|
|
Maximum excavation depth
|
mm
|
6735
|
|
Maximum Digging Height
|
mm
|
9725
|
|
Maximum unloading height
|
mm
|
6720
|
|
Boom length
|
mm
|
5900
|
|
Arm length
|
mm
|
2950
|