Name | stainless steel pipe |
Standard | ASTM, GB, JIS, DIN, EN, AISI |
Material Grade | TP304 TP304L TP316 TP316L TP347 TP347H TP321 TP321H TP310 TP310S |
TP410 TP410S TP403 | |
S31803/S32205 S32750 S32760 | |
Outer Diameter | Seamless Pipe: 4mm-812.80mm |
Welded Pipe: single slit(Φ8mm-Φ630mm); girth(Φ630mm-Φ3000mm), | |
Thickness | Seamless Pipe: 0.5mm - 60mm |
Welded Pipe: single slit(0.5mm-25mm);girth(3mm-45mm) | |
Length | 5.8-6.1 m or as customers' request |
Tolerance | According to the Standard |
Surface | 180G, 320G, 400G Satin / Hairline |
400G, 500G, 600G or 800G Mirror finish | |
Test | UT, ET, HT, RT,ect, and others according to the standard,or as the requests of the customers |
Certificate | ISO9001-2008,ASME, PED |
Delivery Time | 7-12 Days, Depends on stock and process |
Q1. What are your company's main products ?
A1: Our main products are stainless steel/aluminum/copper plate/sheet, coil, round/square pipe, bar, channel, etc.
Q2. How do you control quality ?
A2: Mill Test Certification is supplied with shipment, Third Party Inspection is available. and we also get ISO,SGS Verified.
Q3: What is the terms of packing?
A3: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers requirement.
Q4:What is your delivery time?
A4: For stocks, we could transport the goods to loading port within 7 days after we received your deposit
For production period, it usually takes about 15 days-30 days after receiving the deposit.
Q5. What are the advantages of your company ?
A5: We have many professionals, technical personnel, more competitive prices and best after-dales service than other stainless steel companies.
Q6. How many coutries you already exported ?
A6: Exported to more than 50 countries mainly from America, Russia, UK, Kuwait, Egypt, Turkey, Jordan,India,Philippines, Switzerland, South Korea, Vietnam etc.
Q7. Can you provide sample ?
A7: We can provide the samll samples in stock for free, as long as you contact us.
Customized samples will take about 5-7days.
Q8. Which manufacturing partners are you cooperating with?