Payment terms |
T/T
|
EXW | 30% In advance, 70% before delivery |
FOB | |||
CFR/C&F | 30% In advance, 70% against copy of B/L | ||
CIF | |||
L/C | Total amount above USD 7 0,000, we accept L/C at sight | ||
West Union | Total amount less than USD5,000 | ||
PayPal | |||
Delivery time | 15-20 working days after receiving down payment for one container |
Q1: What are differences among grid-tied, off grid and hybrid solar power system?
A1: Grid-tied system works based on the national grid. If there is without the national utility, the system can not word.
Off grid system can word without the national grid, but if there is national grid, which can be a back up power for the off grid system
Hybrid system, which combine the function of grid-tied and off grid. All in all, it's a grid-tied system, but can also store the power in the battery.
Q2: How about the leading time?
A2: After receiving deposit, 20-30 days.
Q3: How many years of warranty for the solar system?
A3: For the each of accessories, the warranties are different. Solar panel has 10- years linear output warranty and 25years life span. Contorller, inverter and battery has 5-10years warranty years warranty.bracket has 10 years warranty.
Q4: How to design a suitable solar power system?
A4: Just contact our sales engineer, who will design the full set of solution for you based on your really needs with the most competitive cost.