Model |
XE215C |
||
Bucket capacity |
m³ |
0.91 |
|
Standard bucket width |
mm |
|
|
Operating weight |
kg |
2,1500 |
|
Dimension (in transportation) |
Overall length |
mm |
9,520 |
Overall width |
mm |
2,990 |
|
Overall height |
mm |
2,985 |
|
Min. ground clearance |
mm |
485 |
|
Engine |
Model |
BB-6BG1TRP |
|
Total displacement |
L |
6.494 |
|
Rated output power |
KW/rpm |
106.5/1950 |
|
Digging performance |
Max. digging height |
mm |
9,640 |
Max. dumping height |
mm |
6,800 |
|
Max. digging depth |
mm |
6,655 |
|
Max. vertical digging depth |
mm |
5,695 |
|
Max. digging radius |
mm |
9,925 |
|
Boom deflection angle: left/right |
° |
|
|
Min. slew radius |
mm |
3,530 |
|
Min. rear slew radius |
mm |
2,750 |
|
Bucket digging force |
kn |
138 |
|
Track type |
Steel |
||
Track width |
mm |
600 |
|
Travel system |
Track overall length |
mm |
4,255 |
Wheel base |
mm |
3,462 |
|
Track gauge |
mm |
2,390 |
|
Travel speed (Gear I/II) |
km/h |
5.5/3.5 |
|
Gradeability |
% |
70 |
|
Slew speed |
rpm |
13.3 |
|
Bulldozing plate |
Bulldozing plate (width) |
mm |
|
Bulldozing plate (height) |
mm |
|
|
Lifting distance (GL up/down) |
mm |
|
|
Hydraulic pump type |
Piston pump×2 |
||
Fuel tank capacity |
L |
360 |
|
Hydraulic oil tank capacity |
L |
220 |