Advantages
3 axle 45000 liter lng tank trailer
Type | GAS LNG tanker trailer |
Tanker Body | |
Shape | Cylindrical |
Dimension | 9500-13000*2500*3900mm ( can be customized ) |
Volume | 52.6 m³ - 56 m³ |
Compartments | 1 Compartments |
Material | S30408 Q345R |
Design temperature | -196 ~50 ºC |
Design pressure | 0.64 MPa |
Corrosion allowance | 1 mm |
Thermally insulation thickness/material | 25mm / aluminum foil+Degreased fibre paper |
Safety Valve | |
Type | DAH-25 |
Form | Full lift |
Norminal pressure | 4 MPa |
Valve base size | 20 mm |
Rated pressure | 0.69 MPa |
Discharge-pressure | ≤0.76 MPa |
Return-pressure | ≥0.63 MPa |
Chassis | |
Main Beam | Q345B Carbon steel material |
Axles | 2 - 4 pcs 13 - 20tons BPW or Fuwa Axles |
Suspenssion | Mechanical, Air, Bogie |
Landing Leg | JOST E100 |
Brake system | 6pcs T30/30 Brake Chambers, WABCO relay valve |
Tire | 12R22.5, 315/80R22.5, 12.00R24 Triangle Brand |
King Pin | JOST 2" or 3.5 " Bolting Type |
Any parts fitted could according to clients request, contact us to get more. |
Features:
1. Better performance --- finite element analysis is used in vehicle.
2. Meet global road and rail transportation regulations --- IMDG / ADR / RID / TC / CSC / ASME / EN certificates is accessable.
3. Strong beam and frame --- top class rolled steel is used; submerged arc automatic welding; key points are reinforced;
4. High loading capacity --- tough ribs design; low platform; suspensions for various road condition.
5. Long service life --- Strict factory inspections and reliable spare parts.
Tank production process:
Strict production management, longer service life!!!
Wide variety of products One-stop service.
Wide variety of products One-stop service.
Welcome visiting our factory!!!
1. Q: Does your company has your own factory?
A: Yes, we are factory, with long history and famous reputation in Shandong, China.
2. Q: Could you special design and produce for me?
A: Definitely! We have all kinds of professional engineers to meet your various needs.
3. Q: What's your payment term?
A: We accpet both T/T and L/C.
T/T: 30% before production, 70% before leaving factory.
L/C: 100% irrevocable Credit of Letter.
Any question, please let me know!!!