1. It is equipped with 4TNV94 engine as standard, which meets the national three emission standards, with lower fuel consumption and lower noise;
2. The hydraulic main valve, main pump, swing motor, walking motor and other key components are further optimized, the products are more reliable, and the coordination and control of actions are better;
3. Enlarge the optimized radiator for higher heat dissipation efficiency and better effect;
4. The platform and cover are lengthened to improve the internal space, improve the ventilation efficiency of the air duct, and increase the stability of the whole machine;
5. Adopt a new type of cab, optimize the structure and strength of the pilot control system through ergonomics, greatly alleviate the operator's fatigue in operation.
Model
|
CDM6205
|
Basic
|
|
Operating weight
|
21100kg
|
Boom length
|
5675mm
|
Arm length
|
2920mm
|
Standard bucket
|
0.9m³
|
Max. travel speed
|
3.2/5.1 km/h
|
Max. swing speed
|
12.1rpm
|
Grade ability
|
35° (70%)
|
Ground pressure
|
45kPa
|
Max. traction force
|
205kN
|
Engine
|
|
Engine model
|
WP6G175E301
|
Rated power
|
129 kW/2000 rpm
|
Max.Torque
|
760/1400-1600 N.m/rpm
|
Displacement
|
6.75 L
|
Fuel tank
|
380 L
|
Hydraulic
|
|
Max.Flow(total)
|
208×2 L/min
|
Max.Working pressure
|
32.4 MPa
|
Max.Pilot pressure
|
3.9 Mpa
|
Max.Arm digging force
|
97 kN(ISO)
|
Max.Bucket digging force
|
120 kN(ISO)
|
Hrdraulic oil tank
|
280 L
|
Chassis
|
|
Track width
|
600 mm
|
Track shoes number
|
46 (each side)
|
Carrier rollers number
|
2 (each side)
|
Track rollers number
|
7 (each side)
|
Electric
|
|
System vollage
|
24V
|
Battery capacity
|
24 V,120 Ah×2
|