The Gold Wash Plant/Trommel screens provide a simple, efficient and economical solution to upgrade a wide rang of material and optimize the subsequent process steps of recovery.
In view of occurrence of gold in the different raw materials of placer, alluvial / eluvial deposits and allowing for small, medium & large scale of processing for mining, prospecting and batch sampling, Keda provides different wash plant and related complete sets of equipment, to recover gold with high efficiency and low cost, and finally produce gold ingots / bullions.
This method of screening helps to reduce operating and investment cost and to increase product quality, while allowing rapid and large volume processing. Material feeds into the drum, is lifted up by the rotation as it falls back down. This action is repeated with each revolution along the length of the drum. The finer material passes through the screen openings while the larger material tumbles towards its eventual exit at the rear of the drum.
Two kinds of washing plants can be chosen: one plant with trommel for few sticky raw materials, another one with scrubber and trommel for sticky raw materials (such as clay, laterite and kaolin).
According to the size of free gold, different equipment such as jig, centrifugal concentrator, sluice box or shaker table are equipped to the wash plant to recover coarse and fine free gold fully.
Model | Capacity | Trommel Dia.*Len | Sieve Opening | Water Consumption | Power |
(t/h) | (mm) | (mm) | (m 3 /h) | (kW) | |
KDTJ-5 | 1-5 | 400×1300 | 3-10 | 2-5 | 2.5 |
KDTJ-10 | 5-10 | 530×1800 | 3-10 | 5-10 | 3.6 |
KDTJ-30 | 30-40 | 1200×2000 | 3-10 | 120-150 | 5.5 |
KDTJ-50 | 50-70 | 1500×3000 | 3-10 | 150-200 | 7.5 |
KDTJ-100 | 70-100 | 1600*4000 | 3-10 | 180-330 | 15 |
KDTJ-150 | 100-150 | 1800*4000 | 3-10 | 400-500 | 18.5 |
KDTJ-200 | 150-200 | 2000*5000 | 3-10 | 550-650 | 22 |
Our company has its own design and development team and has
21
design patents
Gold vibrating sluice box |
Gold Centrifuge | Jig Machine | Shaking Table |
The above equipment can be used in conjunction with the trommel screen, contact us for more professional design solutions.
Qingzhou KEDA Environment Protection Machinery Co., Ltd
1.More than 10 years of production experience in dredgers and mineral processing equipment
2.Strong technical service team, can provide customized services
3.Own design team with 21 patents
4.Industry and Trade Integration Enterprise
5.The factory covers an area of over 22,000 square meters
6. 3 production lines-dredger-cleaning boat-gold mining equipment
FAQ
Q: What Information should customers give to us in order to let we provide you with efficient & suitable quotation and assistance.
A:1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone,What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4).What is the elements of the raw ore? How much percent % of each minerals?
Q: Can we send the mineral samples to your company, let your company run the ore-dressing experiments test for us?
A: Yes, we can run the ore-dressing experiments for our customers. After the test, we will based on the results to give you the reasonable flowchart, suitable solution and equipments selection. etc.
Q: How long is the warrenty of your equipments? Does your company supply the spare parts?
A: The warranty period of Gelin equipments is one year. And of course we will supply the spare parts for you for life-long time at lowest cost.
Q: If i need the complete mineral processing line. is KEDA able to help us build it?
A: Yes, we can help you combine a complete mineral processing line. and give you related professional advices as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.