I. Fish Feed Machine and Porudced Feed Main Introduction And Feature:
1.
Automatic floating fish feed machine and fish feed machine can produce different shapes food for cattle, sheep, dog, fish or cat etc.
2.Through the pretreatment of the feed, it can reduce loss of nutrition and advance the protein ratio. So the feed will be digested easily by animals.
3.
The fish feed processing line
a
dopts corn flour, wheat flour,low temperature soya flakes meal,
rice bran , wheat bran as raw materials
4.Puffed extrusion fish food machine can produce both Floating and sinking feed pellet. For floating fish feed, it can float around 20 hours.
5. Xilang Fish feed Extruder Machine has advantage of High output, Low consumption and bacterium reducing.
II. Whole Fish Feed Production Line Introduction:
1. Medium Fish feed Production Line Flow Chart:
Mixer - Screw Conveyor- Twin screw Extruder - Air Coveyor - Multilayer Dryer - Hoister - Flaor Machine - Cooling Machine
2. Large Capacity Fish Feed Production Line Flow Chart:
Mixing System - Coveyor system - Big Twin screw Extruder - Drying Sytem - Flavor system - Cooling system
3. Details Introduction For Main Machine:
Model | Power | Consumption | Output (D : 4-10mm) | Install ation Size |
TSE 65 -P (Dry) | 35KW | 22-30KW /H | 100-200KG /H | 15 000* 2 500 *4 000 M M |
TSE 70 -P (Dry) | 45 KW | 30-35 KW /H | 150-300KG /H | 16 000 *25 00 *4 000 M M |
TSE85-P(Dry) | 75KW | 60-65KW/H | 400-500KG/H | 19000*2500*4000MM |
TSE -70(Steam) | 45KW | 32-40KW /H | 250-400KG /H | 27 000 *25 00 *4 500 MM |
TSE - 85 (Steam) | 105KW | 80-95KW /H | 1000-2000KG /H | 39 000 *2 500 *5 000 MM |
TSE -95(Steam) | 200KW | 128-150KW /H | 2000-3000KG /H | 43 000 *25 00 *6 000 MM |
TSE -1 18 (Steam) | 280KW | 200-240KW /H | 3000-5000KG /H | 50 000 *6 000 *8 000 MM |
Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit our factory and check the machines.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
Q: Could you supply all the parameters about the machines?
A: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q: What is your terms of payment ?
A: 30% T/T in advance , 70% balance before shipment after inspection.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
Q:Do you supply any formula to buyer?
A: yes, we supply formulas to buyer.
Q: What's the warranty?
A: warranty one year.