|
Product Name | SV8890 Two Parts Structural Silicone Sealant for Insulating Glass Secondary Seal |
Color | Part A:white+Part B:black=grey black | |
Volume | 190L+19L/ 20L+2L | |
Shelf Life | Part A:12months & Part B: 9months | |
Storage | Stored in dry & cool place between -20 ºC ~ 27 ºC . |
Test Method | Propert y | Un it | Standard Result | |
GB/T 13477 | Slump | m m | ≤3 0 | |
GB/T 13477 | Tack free time | h | ≤3 0.8 | |
GB/T 13477 | Working time (after 20 min.) |
s |
≤ 10 2.2 | |
GB/T531. 1 | Hardness |
Shore
A |
20~60 43 | |
GB 16776 |
Heat
Aging
weight loss cracking chalking |
% |
≤ 10
Nil Nil |
3.5 Nil Nil |
GB/T 13477 |
Tensile
strength 23ºC
90ºC -30ºC water immersion water-UV exposure adhesion failure extension rate at ultimate tensile strength at 23ºC |
MPa
% % |
≥0.60
≥0.45 ≥0.45 ≥0.45 ≥0.45 ≤5.00 ≥ 100 |
1. 13 1.02 1.62 1.01 1.09 0 140 |
SV 8890 Silicone Structural Glazing Sealant is designed for
structural bonding and glazing applications for big glass curtain walls, aluminium
curtain walls, terracotta curtain walls and metal structures, structural second seal of insulating glass and other construction structural glazing
Project Case
Product Usage
A component is white, B component is black, the mixing ratio of A: B1 = 10: 1 (volume ratio), after mixing is
gray-black, the specific sizing method, see the relevant specification.
Automatic sealing
|
A Part 190L/Barrel
|
B Part 19L/Barrel
|
Manual
|
A Part 20L/ Barrel
|
B Part 2L/Barrel
|
SV 998 | SV 8000 | SV 8800 |
Two Component Polysulfide Sealant for Insulating Glass | Two Component Insulating Glass Polyurethane Sealant | Two Component Insulating Glass Silicone Sealant |
SV 201 | SV 888 | SV 999 |
Butyl Sealant for insulating glass primary seal | Weatherproof Silicone Sealant | Structural Glazing Silicone Sealant |
Q: Are you trading company or manufacturer ?
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge, but freight collect.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.