Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical

Model NO.
DL-OG350
Colour
White
Sample
Available
Lead Time
15-25 Days
Shipping Method
by Sea/Air
Payment Terms
T/T, L/C, West Union
Transport Package
25kg/Drum
Trademark
DuLing
Origin
China
Production Capacity
50mt/Month
Reference Price
$ 9.00 - 45.00

Product Description

Product Description

Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-picolinate/ CAS 2524-52-9 Fine Chemical

Specification:
Product Name
 Ethyl picolinate
CAS No.
 2524-52-9
MF
 C8H9NO2
MW
 151.16
  Melting Point    2 °C (lit.)
  Boiling Point     240-241 °C (lit.)
  Density    1.119 g/mL at 25 °C (lit.)
  Assay    99%
Appearance
 Cololess Liquid
  Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical

Packaging & Shipping

The product is packed in plastic barrel or zinc galvanized steel barrel with net weight of 25±0.5kg, 200±1kg or as required
by the customer. Store it in cool, dry and ventilated place.

Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical

Company Profile

Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical

Certifications

Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical

 

Our Market

Factory Bulk Supply Ethyl Picolinate/ Ethyl 2-Picolinate/ CAS 2524-52-9 Fine Chemical

FAQ

 

Q1: What's your advantage?
A: Honest business with competi.tive price and professional serviceon export process.
Q2: Which kind of payment terms doyou accept?
A: Payment by T/T, Western Unionor Bitcoin.
Q3:Which transportation do we use?
A: Samples could be DHL, UPS,TNTEMS, Fedex, and so on;For massorders, It will be delivered by air orsea.
Q4: How about your delivery time?
A: Generally, It will take 3-5 daysafter receiving your advance payment.
Q5: How can we trust you?

Q6: How is your quality control?
Our quality control steps include:
(1) Confirm everything with ourclient before moving to sourcingand production:
(2) check all the materials to ensurethey are correct;
(3) Employ experienced workersand give them proper training;
(4)Inspection throughout the wholeproduction process;
(5) Final inspection before loading.