Product Description
A. Draw
Procedure
1
,
Barn- -scrub mixing drum and remove mud- -roller sieve sieve- -centrifuge to select fine grain gold- -
encourage chute to select gold- -sticky gold grass back to the finishing gold.
2
,
Materials below 2mm were screened into two centrifugal concentrators for gold selection
3
,
After the drum sieve out of the sieve within 2-8mm of the material-into the agitation chute to select gold,
Qingz
sticky gold grass chute back to the final gold
Detail
:
The material is directly into the mud cleaning cylinder from the bin to disperse the sediment. (there is a spiral mud
removal device in the mud cleaning cylinder) the dispersed sediment is washed into the cylinder sieve by high
pressure water for screening, and the mortar below 2mm is screened into two centrifugal gold sorting machines for
reselection.
The material of 2mm-8mm goes into the chute for reselection. In order to avoid running the tail, the material
discharged from the chute is encouraged to enter the filament stick gold grass to further grasp the fine gold, which
has obtained the best gold catching effect.
-
Ore washing equipment
|
Process capacity
|
Soil and sand capacity per hour
|
200-250
T/h
|
|
Trommel overall size
|
1
15
00x
28
00x
43
00mm
|
|
Water consume
|
1300
m³/h
|
|
Totally KW
|
189kw
|
Hopper Feed
|
Size
|
3
2
00x
2
5
00x
10
00mm
|
|
Material steel
|
Bottom 10
mm
Side
8
mm
|
Trommel
|
Drum screen length * diameter
|
7m*1.8m
|
|
Mud scrubber drum length
|
2
m
|
|
Screen mesh length
|
5m
|
|
Driven by
|
chain
|
|
Motor
|
30
kw
|
|
Reducer model
|
JZQ
65
0
|
Detailed Photos
Our Advantages
1. Oversea engineer service
2. Customerized design service
3.Long life spare service
4. Specialized in gold mining washing equipment .
5. Have send gold washing equipment to 153 countries.