Gold Plant for Centrifugal Concentrator
OUR FAITH: CUSTOMER IS NO. 1!
Features
U High concentrating ratio and high recovery
U Total process automation, steady recovery performance
U Center dischange design for fast, secure concentrate removal
U Environmentally friendly(requires no chemical additives or reagents)
U Low water and electricity requirements
U Low production costs, durable wear parts, minimal maintennance requirements
U Compact design requiring less space, easy merged into the existing mining processing
U Quick payback on investment, typically lass than half year
Application shows
That the recovery can be as high as 99%, and the concentrating ratio is up to 1, 000 times. In recovering the natural gold in lode ore with size -0.074mm, the gold is up to 98%, For 0.004mm in particle size, the gold recovery is 97%.
Technical Specifications
Model
STLB20
STLB30
STLB60
Feeding Capacity (T/h)
0-0.6
2-3
8-12
Fluidization Water Required (m3/h)
2-3
3-5
7-10
Slurry Water Required (m3/h)
1.5-4
5-7
8-12
Feeding Density (%)
0-50
0-50
0-50
Feeding Size (mm)
0-3
0-3
0-5
Concentration Cleaning Up Cycle
Vein gold 1-3 Hours Placer gold: 2-6 Hours
Concentrate Weight (Kg)
2
3-5
10-20
Power Requirements (Kw)
0.75
1.5
4
Approximate Shipping Weight (Kg)
205
380
1100
Approximate Crated Shipping Dimensions (mm)
914× 700× 900
1160× 885× 1165
1820× 1450× 1700
Model
|
STLB20
|
STLB30
|
STLB60
|
Feeding Capacity (T/h) ( Capacity)
|
0-0.6
|
2-3
|
8-12
|
Fluidization Water Required (m3/h) (Water consumption)
|
2-3
|
3-5
|
7-10
|
Slurry Water Required (m3/h) (water and ore mixed)
|
1.5-4
|
5-7
|
8-12
|
Feeding Density (%)
|
0-50
|
0-50
|
0-50
|
Feeding Size (mm)
|
0-3
|
0-3
|
0-5
|
Concentration Cleaning Up Cycle
|
Vein gold 1-3 Hours Placer gold: 2-6 Hours
|
Concentrate Weight (Kg)
|
2
|
3-5
|
10-20
|
Power Requirements (Kw)
|
0.75
|
1.5
|
4
|
Approximate Shipping Weight (Kg) ( equipment weight)
|
205
|
380
|
1100
|
Approximate Crated Shipping Dimensions (mm)
|
914× 700× 900
|
1160× 885× 1165
|
1820× 1450× 1700
|