Laboratory Use Siingle Multiple Cell Flotation Machine for Non-Ferrous Metals, Ferrous Metals, Non-Metallic and Coal That 35 Mesh

Model NO.
XFD
Energy Saving
Energy Saving
Warranty
2 Years
Color
Bronze
Customized
Non-Customized
Condition
New
After-sales Service
Accept
Delivery Time
7 Days
Application
Mining Separator
Voltage 1
220V 1p 50Hz
Transport Package
Plywood Case
Specification
600*800*1200
Trademark
chenji
Origin
China
Production Capacity
222
Reference Price
$ 1,863.00 - 2,070.00

Product Description

Laboratory Use Siingle Multiple Cell Flotation Machine for Non-Ferrous Metals, Ferrous Metals, Non-Metallic and Coal That 35 Mesh
  1. Purpose and scope of application XFD-12 laboratory multi-tank flotation machine  is suitable for the flotation of colored, ferrous, non-metallic and coal below -35 mesh; it can be used for flotation of 125-3000 grams of flotation samples Select test.
  2. Specification  
Diameter of impeller :  54mm  73mm  95mm
Flotation cell volume : 500ml  750ml   1000ml   2000ml   4000ml   8000ml
recirculating drum:  φ78×64mm   φ60×30mm   φ100×102mm   φ78×42mm`   φ60×16mm   φ100×50mm
Impeller speed :     0-2750r/minute
Motor JW6324:      250W   2800r/minute
Size:    550 ×380×830 mm
  1. Introduction to the structure of XFD-12 laboratory flotation machine :  is composed of the following main components: lifting mechanism, stepless speed change mechanism, body part, stator, rotor part and control switch
All parts are connected to the column body. The main shaft rotates clockwise, the motor drives the impeller to rotate through the main shaft, and the speed of the impeller can be adjusted by rotating the gearbox handwheel. Adjust the knob of the inverter to set the impeller speed. The main body of the main shaft is lifted and lowered by the motor driving the gear through the gear box, and after driving the lift to the desired position, press the stop switch. When descending, press the descending button, and it will automatically stop when it reaches the bottom due to the travel switch. Note: When changing the lift, you must press the stop button before changing the lift. When lifting and lowering, the operator should keep away from the tank body and fix it on the square hole of the base by four cylindrical pins at the bottom of the tank.
 
  1.   Installation, adjustment and operation method
The flotation machine is installed on the workbench, and the level can be adjusted with four base screws; when the motor is connected to electricity, the rotation direction of the gas should be checked, and the main shaft impeller driven by the motor is required to rotate clockwise; The speed is regulated by the frequency converter. The speed can also be adjusted while the machine is running; the speed can be displayed on the LCD meter of the control panel. In addition, the machine is equipped with a shaking handle, which can also be adjusted to suit the needs or fine-tuning of the stirring conditions. It should be noted that before the electric lift, the handle should be pulled out, and then folded to the inside of the rocker to prevent injury to personnel during the electric lift, and personnel should not be close to the rocker during the electric lift. Impeller, stator and hollow shaft can be replaced. The impeller is connected with the right-handed screw of the main shaft, the stator is connected with the left-handed screw of the hollow sleeve, and the hollow shaft is connected with the left-handed head of the machine head. When replacing, pay attention to the direction of rotation; The circulating cylinder is evenly connected with the stator by three rubber belts;
5. Maintenance and attention
Matters The valve on the hollow shaft is the main valve for cutting off and connecting the gas circuit, and the valve on the flowmeter is a fine-tuning valve. Pay attention to the opening and closing sequence to prevent the slurry from rushing into the flowmeter. When opening, it should be: start the motor - open the main valve - open the fine-tuning valve; when it is stopped, it should be: close the main valve - stop the motor. The sealing ring at the upper end of the hollow shaft should be checked regularly to prevent the slurry from leaking into the bearing due to damage. After installation and maintenance, check the air tightness in clean water at the beginning of operation, that is, close the main valve, start the main shaft, and no air bubbles will be ejected around the stator after starting. is the highest RPM without cramping air from the recirculating cylinder.
Laboratory Use Siingle Multiple Cell Flotation Machine for Non-Ferrous Metals, Ferrous Metals, Non-Metallic and Coal That 35 Mesh Purpose and scope of application
XFD-12 laboratory multi-tank flotation machine is suitable for the flotation of colored, black, non-metallic and coal below -35 mesh; it can be used for flotation test of 125-3000 grams of flotation samples.
 
 Technical Parameter &  Specification
 

No.

Name

I

II

III

Unit
1 Diameter of impeller
 
φ54 φ73 φ95 mm
2 flotation cell
volume
 
500

750
1000

2000
4000

8000

mm


3`

recirculating drum
φ78×64 φ60×30 φ100×102
  mm
 
φ78×42` φ60×16
 
φ100×50
 

4

Impeller speed
     
r / m
0-2750


5

Motor

JW6324

250

W

                    2800

r / m
6
Appearance size

550 ×380×830

mm

7

Weight

 

kgs


Structure Instruction
XFD-12 laboratory flotation machine consists of the following main components: lifting mechanism, continuously variable speed change mechanism, body part, stator, rotor part and control switch.
All parts are connected to the column body. The main shaft rotates clockwise, the motor drives the impeller to rotate through the main shaft, and the speed of the impeller can be adjusted by rotating the gearbox handwheel. Adjust the knob of the inverter to set the impeller speed.
The main body of the main shaft is lifted and lowered by the motor driving the gear through the gear box, and after driving the lift to the desired position, press the stop switch. When descending, press the descending button, and it will stop automatically when it reaches the bottom due to the travel switch.
Note: When changing the lift, you must make sure to press the stop button before changing the lift. During the lifting operation, the operator should keep away from.
The groove body is fixed on the square hole of the base by four cylindrical pins at the bottom of the groove.

Installation, adjustment, operation method
The flotation machine is installed on the workbench, and the level can be adjusted with four base screws;
When the motor is connected to electricity, the direction of gas rotation should be checked, and the main shaft impeller driven by the motor should be required to rotate clockwise;
The speed of the flotation machine is regulated by the frequency converter. The speed can also be adjusted when the machine is running; the speed can be displayed on the LCD meter of the control panel.
In addition, the machine is equipped with a shaking handle, which can also be adjusted to suit the needs or fine-tuning of the stirring conditions. It should be noted that before the electric lift, the handle should be pulled out, and then folded to the inside of the rocker to prevent injury to personnel during the electric lift, and personnel should not be close to the rocker during the electric lift.
    Impeller, stator and hollow shaft can be replaced. The impeller is connected with the right-hand screw of the main shaft, the stator is connected with the left-hand screw of the hollow sleeve, and the hollow shaft is connected with the left-hand screw of the machine head. When replacing, pay attention to the direction of rotation;
The circulating cylinder is connected to the stator equally by three rubber belts;
Maintenance and precautions
The valve on the hollow shaft is the main valve for cutting off and connecting the gas circuit, and the valve on the flowmeter is a fine-tuning valve. Pay attention to the opening and closing sequence to prevent the slurry from rushing into the flowmeter. When opening, it should be: start the motor - open the main valve - open the fine-tuning valve; when it is stopped, it should be: close the main valve - stop the motor.
The sealing ring at the upper end of the hollow shaft should be checked regularly to prevent the slurry from leaking into the bearing due to its damage.
After installation and maintenance, check the air tightness in the clean water at the beginning of operation, that is, close the main valve, start the main shaft, and no air bubbles will be ejected around the stator after starting. This is the highest RPM without cramping air from the recirculating cylinder.
After the flowmeter is disconnected from the system, the suction volume of the machine changes greatly, so be careful when using it.


 Wearing parts & accessories list

 
  NO. Drawing name Specification Qty Notice
1   Skeleton oil seal 16*30*10 3  
2   Bearing 6303 2  
No.  / Name Qty Notice
1   panning dish 1  
2   One-way stirring impeller 1  
3   wrench 1  
4   Two-way stirring impeller 1  
5   scraper 6  



XFD-12 Packing List
(Specification: 0.5, 0.75, 1.0, 2,4, 8L)
No. Name Unit Qty Notice
1 XFD-12 multi-slot flotation machine Set 1  
2 tank PC 6 Random shipments 1PC
3 Stator φ100 PC 1  
4 Stator φ132 PC 1  
5 Stator φ78 PC 1  
6 Impeller φ54 PC 1  
7 Impeller φ73 PC 1  
8 Impeller φ95 PC 1  
9 Circulating cylinder φ78×64, φ28×24 PC Each 1 1 install on the main machine
10 Circulating cylinder φ100×102, φ100×50 PC Each 1  
11 Circulating cylinder φ60×30, φ60×16 PC Each 1  
12 One-way stirring blade PC 1  
13 Two-way stirring blade PC 1  
14 scraper PC 6  
15 wrench PC 1  
16 Bearing 6303 PC 2  
17 Skeleton oil seal PC 3  
18 A-type Allen key 3, 4 PC 1