2500KG New Mini 4WD Diesel Skid Steer Excavator Construction Vehicle

Model NO.
TL25E
Drive Type
Internal Combustion Drive
Bucket Capacity
0.1~0.5m³
Size
Small-Scale
Certification
CE, ISO9001: 2000, SGS
Condition
New
Overall Width
1300mm
Overall Height
2280mm
Overall Length
4800mm
Arm Digging Force
9.3KN
Track width
250mm
Undercarriage width
1270mm
Track length
1630mm
Ground clearance
490mm
Traveling Speed
2.8km/H
Swing Speed
12-14r/min
Engine Model
Laidong 3TE30
Bucket Digging Force
11.5KN
Traveling Tracking Force
15KN
Power
22.1kW/2000rpm
Operation Weight
2200kg
Transport Package
Nude in Container
Specification
4080*1300*2280mm
Trademark
TITANHI
Origin
Shangdong China(Mainland)
HS Code
84295100
Production Capacity
1000 Sets One Year
Reference Price
$ 10,440.00 - 10,620.00

Product Description

2500KG New Mini 4WD Diesel Skid Steer Excavator Construction Vehicle

Product Description

Main Features
  1. Small size and easy to transport,   could be loaded onto  light truck or small trailer , four sets could be loaded into one 20GP container  to save freight cost.
  2. Special design on separating engine and radiation space, using enhanced cooling fan to increase cooling efficiency
  3. Famous brand hydraulic system parts ensure the stable quality.
  4. equipped  with double fuel filter to guarantee fuel purity to protect engine.
  5. boom defle ct ion design meet narrow work condition, reinforced rubber track to protect road
  6. extend hydraulic line for various attachments.
  7. comfort seat make operator easy to work.
  8. Cabin with heater is optional.
  9. Could be widely used in gardening, orchard, farming, basement reconstruction, waste residue carrying in coal washing factory, papermaking factory etc. and could replace 4~5 manpower.
2500KG New Mini 4WD Diesel Skid Steer Excavator Construction Vehicle
Engine
Model Laidong 3TE30 22.1 kW/2 0 00rpm
Type Direct injection, wind cooled,  natural intake
No. of cylinder 3
Main Performance
Main Speed r/min 12-14
Traveling Speed km/H 2.8
Grade ability KN 70(35°)
Traveling Tracking Force KN 15
Bucket Digging Force KN 11.5
Arm Digging Force KN 9.3
Overall Dimensions
Overall Length mm 4800
Overall Width mm 1300
Overall Height mm 2280
Counterweight Ground clearance   mm 490
Track Length mm 1630
Track Width mm 250
Undercarriage Width mm 1270
Undercarriage ground clearance mm 235
Dozer Blade mm 1270*240
Operation Paramters
Operation Weight KG 2200
Bucket Capacity 0.1
Max. Digging Radius mm 4370
Max. Digging Depth mm 2450
Max. Diiging Height mm 2290
Max. Dumping Height mm 370
Max. Dozer Cutting mm 310
Max. Dozer Lifting mm 240
Boom Deflexion Radius ° 70/50
Tail Swing Radius mm 1180
Front Min. Swing Radius mm 2023
Hydraulic System
Hydraulic system working pressure Mpa 16
Hydraulic Pump Gear Pump AHWY
Hydraulic pump flow L/min 2*12+5
Swing Motor   Eaton
Traveling Motor   Eaton
Fuel Tank Capacity L 26
Hydraulic Tank Capacity L 27

2500KG New Mini 4WD Diesel Skid Steer Excavator Construction Vehicle
Attachment
2500KG New Mini 4WD Diesel Skid Steer Excavator Construction Vehicle
Packing&Shipping

2500KG New Mini 4WD Diesel Skid Steer Excavator Construction Vehicle

Application 

TL10E excavator with compact design, it is suitable to be used for small works, small projects, in garden, farmland, municipal works,vegetable greenhouse.


OUR SERVICE

Pre-Sales Service
(1) Inquiry and consulting support. 
(2)Sample testing support. 
(3)View our Factory.

After-Sales Service
(1)Training how to instal the machine, training how to use the machine. 
(2)Engineers available to service machinery overseas.




FAQ

Q:Why choose Titan?
1) Titan: an experienced loader manufacturer with over 11 years.
2) Titan TEAM: customers-focused,you'll get reply within 5 minutes.
3)Titan: premium quality with reasonable price.
4) Titan: CE,BV,SGS,ROPS and FOPS,ISO9001:2008 varified.

Q:What is Titan warranty?
1) Titan after-sales: life-long, meantime offer one year and one month warranty.
2) Titan proposal: order some wearing parts with loader for easy maintenance.

Q:What about Titan delivery term?
10-14 days after down payment received.

Q:What about the payment term?
30% advance payment,70% balance by T/T.