System requirement instruction | ALICO SOLAR-15000W off-grid photovoltaic system | |||
Design Basis | the system DC voltage is set to 48 VDC 96v | |||
System configuration and offer | ||||
Item | Part | Specification | Quantity | Remarks |
1 | Solar Panel | Half mono 450w | 30PCS | connection method : 3pcs in one string and 9 strings in parallel |
2 | PV combiner box | 3 inputs, 1 output | 3 SETS | |
3 | Bracket | C-shaped steel | 1 SET | |
4 | Inverter with mppt controller | 15000W | 1set | 1, Built-in 60A MPPT controller |
2, pure sine wave, high frequency output | ||||
3, support grid/Diesel input | ||||
5 | LiFePo4 battery | 48V-100AH | 6 PCS | |
6 | DC breaker(battery to inverter) | MCCB 100A 2P | 3 PCS | |
7 | Connector (pv cable to solar panel) | MC4 | 9 pairs | |
8 | PV cables(solar panel to inverter) | 4mm2 | 600M | 300M red+300M black |
9 | BVR cables(pv combiner box to inverter) | 10mm2 | 120M | 60M red +60M black |
10 | BVR cables(confluence box to inverter) | 35mm2 | 16M | 8M red + 8M black |
Instructions | 1. The battery can support 9000W load work 3hours. | |||
2. The maximum power load should not exceed 12000W (including inductive load impact: such as refrigerators, air conditioners, washing machines, etc. with motor load). | ||||
3. The battery can be fully charged in 3hours under STC sunshine condition. |
SRNE Inverter
5 years warranty
12MW Commercial Metal Roof Solar Plant in Changzhou City, Jiangsu Province, China, Finished in Nov, 2015
20MW Ground Solar Plant in USA 50MW Solar Plant in Brazil 20KW Solar Plant in Mexico