Sanipro 1 1/4" *6" 19 Holes Grid Drain Tailpiece Cp

Model NO.
116001
Kind
Sink Strainer
Indoor/Outdoor
Indoor
Odour Proof
Odour Proof
Style
Strainer
Color
Silver
Wastewater Type
Domestic Wastewater
Size
1-1/4"
Surface
Chrome Plated
Transport Package
1PC/Bag/White Box or Blister Card, Colorbox
Trademark
SANIPRO
Origin
China
HS Code
848180409
Production Capacity
50000PCS/Month
Reference Price
$ 2.96 - 3.29

Product Description

Dear Friends,
Thanks for visiting our product page.
Please check what you are interested in.
Any question,please just feel free to contact our salesmen for further help.

Sanipro 1 1/4" *6" 19 Holes Grid Drain Tailpiece Cp

Product Details
 
Item no. 116001
Item name 1/4'' *6" 19 holes GRID DRAIN 17GA tailpiece brass CP 
Material Brass body,rubber seal,brass back nut  
Size 1/4'' *6" wiht 19 holes
Type centre pop-up cap /small cap
Surface treatment polished & chrome plated
Feature a.Durable solid  brass construction.
b. Multi-layer finishing process; stunning looks
c.Engineered for a lifetime of use
d. Heavy rubber basin waster 


More details
Sanipro 1 1/4" *6" 19 Holes Grid Drain Tailpiece Cp Sanipro 1 1/4" *6" 19 Holes Grid Drain Tailpiece Cp

Sanipro 1 1/4" *6" 19 Holes Grid Drain Tailpiece Cp
Sanipro 1 1/4" *6" 19 Holes Grid Drain Tailpiece Cp

RFQ

Q:What is the guarantee for your products?
A:Five years guarantee

 
Q:What is the payment for your product? Is L/C acceptable?
A: 30% deposits and 70% balance against the copy of B/L.  L/C is acceptable ,but it should depend on your total amount.
 
Q:What is the delivery time for the products?
A : Around 20 days for 20ft normally. But it should depend on your quantities and style exactly.
 

Our Services

* Selections from our existing products

* Taylor made to suit customer need

* OEM products to customer's design with complete new Molds and Dies fabrications

 

Payment Term

* Usually Pay by  T/T L/C  

* We can also do other payment terms for small amount,such as paypal,western union ..etc.

 

Shipping Term

* Loading Port: Ningbo or Shanghai, China

* Sample Delivery: 7-10days for normal products in stock.

* Mass Production Delivery: 20 - 50days after sample confirmation.