201 304 316 Hot Rolled Industrial Stainless Steel Seamless Tube Pipe Air Condition Boiler or Heat Exchanger Tube

Model NO.
HZ2023
Surface Treatment
Polished
Customize
Available
Length
Max. 13 Meters (Specific or Random)
Diameter
3-480mm
Section Shape
Round
Transport Package
Standard Sea Package
Specification
0.3mm-50mm
Trademark
HONGZE
Origin
China
HS Code
7219340000
Production Capacity
5000 Tons Per Month
Reference Price
$ 1,548.00 - 1,566.00

Product Description

Product Description

Main Products :
Stainless Steel Plate
Stainless Steel Coil
Stainless Steel Strip
Stainless Steel Bar
Stainless Steel Pipe
Stainless Steel Pipe Fittings
Stainless Steel Flange
Available in various sizes, dimensions, shapes and Custom size and shape available !

Industry stainless steel seamless pipe use for water project

1.Material: 304,304L

2.OD: 10 - 273.5 mm  Thickness: 0.8 - 8.0 mm

3.Delivery Time: 7-30Days

4.Certs: ISO 9001-2008, CE. PED
stainless steel seamless pipe  also widely used in    petroleum,foodstuff,chemical industry,construction, electric power,nuclear,energy,machinery,biotechnology,paper  making,shipbuilding,boiler fields.

Pipes also can be made according to the customer's required.

product name Manufacturer Price ASTM AISI JIS 304 304L 316L Round Stainless Steel Pipe
Surface 
Polishing,annealing,pickling,bright
Standard
GB, AISI, ASTM, ASME, EN, BS, DIN, JIS
Technique
Cold Rolled, Hot Rolled
Grade
304,304L,309S,310S,316,316Ti,317,317L,321,347,347H,304N,316L, 316N,201,
202
Thickness
0.4mm-30mm or customized
Out diameter
6mm-630mm or customized
Length
2000mm, 3000mm,4000mm, 5800mm, 6000mm,12000mm or as required
Processing Type
Cutting, bending,welding
Application
Widely used in petroleum,foodstuff,chemical industry,construction, electric power,nuclear,energy,machinery,biotechnology,paper
making,shipbuilding,boiler fields.
Pipes also can be made according to the customer's required.
Lead Time
7-15 working days after the receipt of 30% deposit
Payment Terms
30% TT in advance, 70% TT /70% LC at sight balance before shipment
Price Terms
FOB, EXW, CIF, CFR
Packing
Each tube in a plastic bag with size label outside and pack in small bundles
or according to customer request
201 304 316 Hot Rolled Industrial Stainless Steel Seamless Tube Pipe Air Condition Boiler or Heat Exchanger Tube
   Material Grades
 
Grade
C
Cr
Ni
Mo
Other
301
≤0.15
16.0~18.0
6.00~8.00
-
-
301L
≤0.030
16.0~18.0
6.00~8.00
-
N≤0.20
304
≤0.08
18.0~20.0
8.00~10.50
-
-
304J1
0.02~0.05
16.5~17.1
7.5~7.9
-
Cu1.9~2.2
304L
≤0.030
18.0~20.0
9.00~13.00
-
-
304N1
≤0.08
18.0~20.0
7.00~10.50
-
N0.10~ 0.25
304N2
≤0.08
18.0~20.0
7.50~10.50
-
Nb≤0.15
316
≤0.08
16.0~18.0
10.00~14.00
2.00~3.00
-
316L
≤0.03
16.0~18.0
12.00~15.00
-
-
321
≤0.08
17.0~19.0
9.00~13.00
-
Ti5×C%
409L
≤0.03
17.0~19.0
-
-
Ti6×C%~0.75
410L
≤0.03
11.0~13.5
-
-
-
430
≤0.12
16.0~18.0
-
-
-
430J1L
≤0.025
16.0~20.0
-
-
Nb8(C%+N%)~0.8
Cu0.30~0.80
436L
≤0.025
16.0~19.0
-
0.75~1.25
Ti,Nb,Zr8
×(C%+N%)~0.8
410
≤0.15
11.5~13.5
-
-
-
420J1
0.16~0.25
12.0~14.0
-
-
-
420J2
0.26~0.4
12.0~14.0
-
-
-
2205
0.38~0.43
21~23
4.5~6.5
2.5~3.5
-
2507
≤0.03
24.0~26.0
6.00~8.00
3.0~5.0
-
 
No. GB RUSSIA AISI,ASTM JIS BS DIN ISO
1 1Cr18Ni9 12KH18H9 302,S30200 SUS302 302S25 X12CrNi88 12
2 0Cr18Ni9 08KH18H10 304, S30400,TP304 SUS304 304S15 X5CrNi89 11
3 00Cr19Ni10 Z2CN18.09 304L S30403,TP304L SUS304L 304S12 X2CrNi189 10
4 1Cr18Ni9Ti         X10CrNiTi189  
5 0-1Cr18Ni12Mo2 Ti Z6CNDT17.12     320S17 X10CrNiMoTi1810  
6 00Cr17Ni14Mo2 03KH17H14M2 316Ls S31603,TP316L SUS316L 316S12 X2Cr 19,19
7 0Cr25Ni20   310S,S31008s TP310S SUS310S      
8 0Cr23Ni13   309S, S30908 SUS309S      
9 0Cr17Ni12Mo2N   316Ns S31651 SUS316N      
10 00Cr17Ni13Mo2N Z2CND7.12N   SUS316LN   X2CrNiMoN1812  
11 0Cr18Ni12Mo2Cu     SUS316JI      
12 00Cr18Ni14Mo2Cu2     SUS316JIL      
13 0CM9NM9N ZCNS18.09A2 304 SUS304N      
Our Advantages

1. More than 10 years experience in dealing stainless steel business.

2. Professional business sales.

3. Competitive price with good quality material.

4. Own reputation from customers.

5. Full positive attitude and responsibility to fulfill clients.

6. Reply email within eight hours.

7. 24--hours Online Service.

Detailed Photos

201 304 316 Hot Rolled Industrial Stainless Steel Seamless Tube Pipe Air Condition Boiler or Heat Exchanger Tube
 

Certifications

 

201 304 316 Hot Rolled Industrial Stainless Steel Seamless Tube Pipe Air Condition Boiler or Heat Exchanger Tube
Packaging & Shipping

 

201 304 316 Hot Rolled Industrial Stainless Steel Seamless Tube Pipe Air Condition Boiler or Heat Exchanger Tube  Shipping:

1.  WORLDWIDE SHIPPING.  (Except some countries and APO/FPO) 
 
2.  Goods delivered by 20" , 40" FCL/LCL by quantity or customer's request .
 
3.  Customers specifying freight forwarders or negotiable shipping methods!

4.  Delivery Time:  10-30days after conformed or according to quantity.

Application

A) General service industries (petroleum, food, chemical, paper, fertilizer, fabric, aviation and nuclear)
B) Fluid, gas and oil transport
C) Pressure and heat transmission
D) Construction
E) Boiler heat exchangers

FAQ

Q1: What products can you offer?

A: We can offer you general steel types like 310S, 316L,304.304L.201,904L, 316H, 316,316L 300and 
400 series, and duplex stainless steel like 2205, 2304,2101,2507,etc. 904L, 800H, 600H high-nickel alloy.

Q2. Can you produce the products according to my own drawings?

Yes, we can produce the products according to your drawings that will be most satisfy you.

Q3. How does your factory do regarding quality control?

Quality is a priority. We always attach great importance to quality controlling from the beginning to end.

Q4. Can I request to change the form of packaging and transportation?

Yes, We can change the form of the packaging and transportation according to your request, 
but you have to bear their own costs incurred during this period and the spreads.
 

Q 5 . How does your factory do regarding quality control?

Quality is a priority. We always attach great importance to quality controlling from the beginning to end.


Q 6 .  How long is the delivery time?

A: 7~20 working days after confirming the payment.
If the order is urgent, we will push our workshop finish in advance.

Q 7 .  What is your Payment?  

A:  100% T/T advance, Western Union (For Small Order) 

B:  30% T/T and balance 70% before the shipment