Description
Off-grid pv system can covert solar energy into electric energy. It is an ideal choise for no electricity or power shortage areas, According to the application requirements , off-grid PV system an be configured with energy storage devices, susch as storage bettery system, so as to storage the extra electricity for night use.
Application
Off-grid PV system are mainly applid in remote areas where the national electricity grid hardly cover, suc as countriyside , pastoral area, island , desert, border defense. It can also provide the basic electricity for lighting, television, brodcast , ets, as well as communication station, expressway monitoring, meteorological station , forest fire prevenion , fishmen aquacutrue , etc.
Featarues
Modular design, easy for installation
Stable operation system
Maintenance free batteries, long life
One-time investment , high rate of return
1000W off-grid solar power system | |||
Name of Load | Power | Working Hours | Consumption |
TV | 120W | 6hours | 720Wh |
Computer | 100W | 4hours | 400Wh |
Lighting | 60W | 6hours | 360Wh |
Fan | 2*80W | 10hours | 1600Wh |
Fridge | 120W | 24hours | 1440Wh |
Washing machine | 300W | 1hours | 300Wh |
Water pump | 150W | 2hours | 300Wh |
Total | 1010W | 5120Wh |
2000W off-grid solar power system | |||
Name of Load | Power | Working Hours | Consumption |
TV | 2*120W | 8hours | 1920Wh |
Computer | 2*150W | 4hours | 1200Wh |
Lighting | 150W | 8hours | 1200Wh |
Fan | 3*80W | 12hours | 2880Wh |
Fridge | 120W | 24hours | 1440Wh |
Washing machine | 300W | 1hours | 300Wh |
Water pump | 500W | 2hours | 1000Wh |
Hair Drier | 500W | 0.5hours | 250Wh |
Total | 2350W | 10190Wh |
3000W off-grid solar power system | |||
Name of Load | Power | Working Hours | Consumption |
TV | 2*120W | 8hours | 1920Wh |
Computer | 2*150W | 4hours | 1200Wh |
Lighting | 150W | 8hours | 1200Wh |
Fan | 3*80W | 12hours | 2880Wh |
Fridge | 120W | 24hours | 1440Wh |
Washing machine | 300W | 1hours | 300Wh |
Water pump | 500W | 2hours | 1000Wh |
Hair Drier | 500W | 0.5hours | 250Wh |
Air conditioner | 1HP(750W) | 6hours | 4500Wh |
Total | 2350W | 14690Wh |
5000W off-grid solar power system | |||
Name of Load | Power | Working Hours | Consumption |
TV | 2*120W | 8hours | 1920Wh |
Computer | 2*150W | 4hours | 1200Wh |
Lighting | 150W | 8hours | 1200Wh |
Fan | 3*80W | 12hours | 2880Wh |
Fridge | 120W | 24hours | 1440Wh |
Washing machine | 300W | 1hours | 300Wh |
Water pump | 500W | 2hours | 1000Wh |
Hair Drier | 500W | 0.5hours | 250Wh |
Air conditioner | 2HP(1500W) | 8hours | 12000Wh |
Printer | 150W | 1hours | 150Wh |
Projector | 300W | 3hours | 900Wh |
DVD player | 50W | 3hours | 150Wh |
Total | 2350W | 14690Wh |
FAQ:
Q: What material of solar panel?
A:Solar photovoltaics are made with a number of parts, the most important of which are silicon cells. Silicon, atomic number 14 on the periodic table, is a nonmetal with conductive properties that give it the ability to convert sunlight into electricity. When light interacts with a silicon cell, it causes electrons to be set into motion, which initiates a flow of electricity. This is known as the "photovoltaic effect."
Q: What about the leading time?
A: In general, the leading time is about 7 to 10 days. But please confirm the exact delivery time with us as
different products and different quantity will have different leading time.
Q: How about the packing and shipping?
A: Normally, we have carton and pallet for packaging. If you have any other special requirements, please feel
free to contact with us.
Q: How about custom logo and other OEM?
A: Please contact with us to make sure the detailed things before placing order. And we will help you make
the best effect. We have talented engineer and great team work.
Q: Is safety of the product?
A: Yes, the material is Eco-friendly and non-toxic. Of course, you can also make a test on it.
Att : Panda Feng
W:
W:
ADD: No. 18, Dongfeng South Road, Zhongluotan Town, Guangzhou, Guangdong, China