Description |
Wheel Bearing Kit
Wheel Hub Bearing Assembly |
OE Number | VKBA6722 / 4419184 |
Size |
Inner Diameter: 45 mm
Outer Diameter1: 80 mm Width: 60 mm Bearing: Tapered Roller Bearings Supplementary information2: with integrated ABS sensor |
Position | Rear Axle Left and Right |
Brand | SI, PPB |
Weight | 1.58 Kgs |
Place of Origin | Zhejiang, China |
Certification | ISO9001, TS16949 |
Warranty | 12 months or 30,000 Kms |
Application | NISSAN OPELL RENAULTT BUS PLATFORM VAN |
OPE
LL
: 4419184
OPEL L : 4421076 OPEL L : 93168843 OPEL L : 93197150 OPEL L : 95522509 |
NISSAN : 43210-00Q0A
NISSAN : 43210-00Q1B RENAULT : 43 21 041 77R RENAULT : 43 21 070 45R |
VAUXHALL : 44 19 184
VAUXHALL : 93197150 VAUXHALL : 95522509 |
SKFF : VKBA 6722
FAGG : 713 6450 50 SNR : R141.28 A.B.S. : 201604 |
BLUE PRINT : ADN18385
FEBI BILSTEIN : 44782 KAVO PARTS : WBK-6554 KAVO PARTS : WBK-6556 |
NIPPARTS : N4711075
OPTIMAL : 702904 RUVILLE : 5373 |
Vehicle Models | Active Years | Engine | Displacement | Power | Cons.Type |
NISSAN NV400 Bus (X62, X62B) dCi 100 | 2011-2014 | M9T 670,M9T 672,M9T 676 | 2299 | 74 | Bus |
NISSAN NV400 Platform/Chassis (X62, X62B) dCi 100 | 2011-2014 | M9T 670,M9T 672,M9T 676 | 2299 | 74 | Platform/Chassis |
NISSAN NV400 Van (X62, X62B) dCi 100 | 2011-2014 | M9T 670,M9T 672,M9T 676 | 2299 | 74 | Van |
OPELL MOVANO B Bus (X62) 2.3 CDTI FWD (JV) | 2023- | M9T 716 | 2298 | 132 | Bus |
OPELL MOVANO B Platform/Chassis (X62) 2.3 CDTI FWD (EV, HV, UV) | 2014- | M9T 870 | 2298 | 81 | Platform/Chassis |
OPELL MOVANO B Van (X62) 2.3 CDTI FWD (FV) | 2014- | M9T 702 | 2298 | 120 | Van |
RENAULTT MASTER III Bus (JV) 2.3 dCi 100 FWD (JV0A, JV0B, JV0G, JV0H) | 2011- | M9T 670,M9T 672,M9T 676,M9T 870 | 2298 | 74 | Bus |
RENAULTT MASTER III Platform/Chassis (EV, HV, UV) 2.3 dCi 100 FWD (EV0A, EV0B, HV0A, HV0B, UV0A, UV0B,... | 2010- | M9T 670,M9T 672,M9T 676,M9T 870,M9T 876 | 2298 | 74 | Platform/Chassis |
RENAULTT MASTER III Van (FV) 2.3 dCi 100 RWD (FV0B) | 2010- | M9T 690,M9T 890 | 2298 | 74 | Van |
Packaging Details |
1 piece in a single box
2 boxes in a carton 30 cartons in a pallet |
Nearest Port | Shanghai or Ningbo |
Lead Time |
For stock parts: 1-5 days.
If no stock parts: < 20 pcs: 15-30 days ≥ 20 pcs: to be negotiated. |