Model
|
XS 7.6
|
XS 4.08
|
XS 1.95
|
XS 0.5
|
|||
Bed Surface Type
|
Coarse Sand Bed Surface
|
Fine Sand Bed Surface
|
Slurry Bed Surface
|
3 Kinds Of Bed Surfaces Selectable
|
|||
Beneficiation Area of Bed Surface (m2)
|
7.6
|
7.6
|
7.6
|
4.08
|
1.95
|
0.5
|
|
Bed Surface Dimension
|
Length (mm)
|
4500
|
4500
|
4500
|
3000
|
2100
|
1100
|
Width of Driving End (mm)
|
1850
|
1850
|
1850
|
1320
|
1050
|
500
|
|
Width of Concentration End (mm)
|
1550
|
1550
|
1550
|
1100
|
850
|
430
|
|
Max. Feed Size (mm)
|
2
|
0.5
|
0.074
|
Ore Sand -2 Slurry -0.1
|
Ore Sand-2 Slurry -0.074
|
Ore Sand -2 Slurry -0.074
|
|
Capacity (t/h)
|
1 ~1.8
|
0.5 ~1
|
0.3~0.5
|
0.4~1.5
|
0.3~0.8
|
0.05~0.2
|
|
Feed Density (%)
|
20 ~30
|
18 ~25
|
15 ~20
|
10 ~30
|
|||
Stroke (mm)
|
16 ~22
|
11 ~16
|
8~16
|
6~30
|
12 ~28
|
9~17
|
|
Jig Frequency (r/min)
|
220
|
250
|
280
|
210~320
|
250~450
|
280~460
|
|
Water Consumption (t/h)
|
0.7 ~1
|
0.4 ~0.7
|
0.4 ~0.7
|
0.3~1.5
|
0.2 ~1
|
0.1~0.5
|
|
Notch Groove Section Shape
|
Rectangle
|
Sawtooth Wave
|
Triangle
|
Rectangle, Sawtooth Wave and Triangle Selectable
|
|||
Motor Power (kW)
|
1.1
|
1.1
|
1.1
|
1.1
|
1.1
|
0.55
|
Features of Shaking Table:
1.Great ratio of high-grade ore, efficient separating, easy operation, easy to adjust the stroke.
2.Strong wear resistance of the working surface.
3.Anti-chemical corrosion, acid and alkali.
4.Strong resistance to harsh evironment.
6 Types of Gold Ore
Flow chart of gold ore processing
Placer gold ore with high gold content mostly exists in the form of particles. Therefore, the ideal method to process placer gold ore is gravity separation.
(A) Pre-sale services:
Act as a good adviser and assistant of clients, enable them to get rich and generous returns on their investments. 1. Select equipment model; 2. Design and manufacture products according to clients' special requirement; 3. Train technical personnel for clients; 4. Services during the sale; (B)Provide considerate services to minimize clients' worries: 1.Assist clients to prepare for the first construction scheme; 2.Install and debug the equipment; 3.Train the first-line operators; 4.Examine the equipment; 5.Take initiative to eliminate the troubles rapidly; 6.Provide perfect service; 7.Provide technical exchanges... (C).After-sale services:Provide considerate services to minimize clients' worries: 1.Assist clients to prepare for the first construction scheme; 2.Install and debug the equipment; 3.Train the first-line operators; 4.Examine the equipment; 5.Take initiative to eliminate the troubles rapidly; 6.Provide perfect service; 7.Provide technical exchanges.. |
Standard Export Packing:
Standard export packing, Spare parts in wooden case, big machines loaded in container,large machines use nude packing, cover with plastic cloth. We export through QingdaoPort, also can be nominated by customer.
We have superior cargo agent to arrange thesea shipment for each client, competitive price, secure transportation.
Delivery Time: We will customize according to the actual needs of customers. Senior designers start to design the plan. After receiving the deposit, we will complete the delivery within 10 to 20 working days. |
Q: For providing you the suitable quotation we need to know the following information:
|