1. High concentrating ratio and high recovery
2. Total process automation, steady recovery performance
placer/alluvial gold washing plant with sticky clay, mud, stone etc
3. Center dischange design for fast, secure concentrate removal
4. Environmentally friendly(requires no chemical additives or reagents)
5. Low water and electricity requirements
6. Low production costs, durable wear parts, minimal maintennance requirements
7. Compact design requiring less space, easy merged into the existing mining processing
8. Quick payback on investment, typically lass than half year
Application shows
That the recovery can be as high as 99%, and the concentrating ratio is up to 1, 000 times. In recovering the natural gold in lode ore with size -0.074mm, the gold is up to 98%, For 0.04mm in particle size, the gold recovery is 97%.
A
im at solve discontinuous work, complicated stop washing operations and waste manpower etc these shortcomings of older model products, our company developed automatic discharging system, now our new concentrators can be fully automated. No longer needed stop the concentrator and wash concentrates by manpower, only needed push start and stop buttion on the antomatic control system to complete all works. Because whole process is closed operation, it can avoid man-made concentrate loss. Besides, our concentrator adopt soft materials at shock-absorbing places, it can effectually decrease negative effects issued from the vibration, and increase of service life.
200t/h Alluvial gold ore project in Ghana, which is invested by Australia Golden Group, after this project, they order us another 100t/h alluvial gold washing plant, total amount is more than $360,000
Rovide high quality, best service and competitive price mining plants with flowchart and design diagram. Such as shaking table, jig, gold trommel, gold sluice, rotary screen, sand washer, spiral chutes, screening equipment, stone crusher, rock crusher, impact crushers, sand cleaning machine, belt conveyor, vibration screen etc which passed ISO9001: 2008 Certification.
We can make a special mineral processing approach for you with least cost & simplest way. We also provide all small/lab testing mining equipment, welcome to contact me for the details. Please do not hesitate to contact for possible business co-operation on below E-mail.
Laos 100t/h alluvial gold washing plant
Model
|
STLB20
|
STLB30
|
STLB60
|
STLB80
|
Capacity (T/h)
|
0-0.6
|
2-3
|
8-12
|
40-45
|
Fluidization Water Required (m3/h)
|
2-3
|
3-5
|
7-10
|
30-36
|
Slurry Water Required (m3/h)
|
1.5-4
|
5-7
|
8-12
|
40-45
|
Feeding Density (%)
|
0-50
|
0-50
|
0-50
|
0-50
|
Feeding Size (mm)
|
0-3
|
0-3
|
0-5
|
0-5
|
Concentration Cleaning Up Cycle
|
Vein gold 1-3 Hours Placer gold:2-6 Hours
|
Concentrate Weight (Kg)
|
2
|
3-5
|
10-20
|
40-50
|
Power Requirements (Kw)
|
0.75
|
1.5
|
4
|
11
|
Weight (Kg)
|
205
|
380
|
1100
|
2300
|
Dimensions (mm)
|
914×700×900
|
1160×885×1165
|
1820×1450×1700
|
2520*1900*2023
|
placer/alluvial gold washing plant without clay